Heavy Civil
Locks and Dams
Our extensive experience on projects such as upgrading miter gates, modifications, log flume cuts, stress relief cuts, bridge column shafts, fish bypass systems, seismic upgrades and hammering dam faces has made us the industry’s preferred cutting and hammering contractor.

Dam removal, demolition, modifications, and restoration
Our projects have involved seismic upgrade requirements including the construction of a new back-up dam in the event that the original dam ever failed. The professional Bluegrass team has worked on dam upgrades that involved the construction of a combined roller-compacted concrete (RCC) mid-section and rockfill berms and back filling in the toe of the dam to depths of 60 feet.