BRIGHTWATER PROJECT

KENNY CONSTRUCTION
Bluegrass technicians scheduled to make two isolation cuts for slurry wall demolition which measures four feet by sixty feet at thirty feet tall.

For more project details visit The Brightwater Project.
Back to Top
Wanapum Dam Unit Infil

Bluegrass technicians will diamond wire saw 15 areas 75' down upstream wall.Total cutting is estimated at 7,695 square feet.
Back to Top
BASELINE
View
View
View
Click to view larger image

Performed diamond wire sawing and Brokking for fish flume system.
Back to Top
BENICIA REFINERY
View
View
View
Click to view larger image

Diamond wire sawed compressor foundations for sectioning.
Back to Top
BNSF BILLINGS
View
View
View
Click to view larger image

Taking less than a week, two Bluegrass technicians diamond wire sawed multiple, four feet by eighteen feet bridge piers for removal after the new railroad bridge was built.
Back to Top
HUMBOLDT PLANT
View
View
View
Click to view larger image

Bluegrass diamond wire cut a 250’ tall concrete ventilation stack located directly adjacent to the spent fuel storage area.  Bluegrass cut the stack into ring sections of specified length, while working from a moveable, elevated platform. All cooling water was contained and recycled during the cutting process due to contamination potential.
Back to Top
KISSNER PRICE-STUBB DAM
Click to view larger image

Bluegrass technicians diamond wire sawed an ogee dam cut twelve feet by nine feet by three feet as well as core drilled three holes nine feet deep.
Back to Top
RIVERSIDE
View
View
View
Click to view larger image

Cut down a 30' diameter water intake tower with the last phase of the diamond wire sawing being done 100' underwater.
Back to Top
ROCKY REACH DAM
View
View
View
Click to view larger image

Diamond wire sawed and Brokking for fish bypass system.
Back to Top
SMUD
View
View
View
Click to view larger image

Diamond wire sawed in support of the Reactor Vessel Head Segmentation project as well as segmenting reactor head for transport.
Back to Top
SMUD Shaver
Click to view larger image

Bluegrass performed a technology demonstration of the Marcrist Diamond Floor Shaver and MWS300 Wall Shaver, at the Rancho Seco Nuclear Power Plant turbine building, as requested by the DOE and EPRI, and in conjunction with the National Energy Technology Laboratory (NETL) and several nuclear utility companies. The floor and remote controlled surface decontamination shaving systems shaved concrete at 1/8” to 1/4“ depths, producing a completely smooth, finished surface.
Back to Top
SPHERE ENCLOSURE BUILDING
View
View
View
Click to view larger image

Performend diamond wire sawing in support of decommissioning of Unit 1 for the demolition of the Sphere Enclosure Building.
Back to Top
WANAPUM
View
View
View
Click to view larger image

Diamond wire sawed openings in dam to create fish bypass system.
Back to Top
BRILLIANT DAM
View
View
View
Click to view larger image

Bluegrass technicians wire sawed a notch from nine piers which required eight feet deep wire access holes.  The removed blocks were thirteen tons each and required one vertical and one horizontal cut per pier.
"Bluegrass' expertise in diamond wire sawing services was a great benefit to Dix Corporation while preparing for the installation of a spillway isolation gate at Brilliant Dam."
Back to Top

Please click the links below for more details on these projects.

Contact us for an estimate.

west refinery shut-down concrete cutting wire sawing