BP CHEMICAL

Approximately two to three hundred square feet of flush cutting with diamond wire saws will be completed for the removal of abandoned pump foundations, tank stands, etc.
Back to Top
CC METALS AND ALLOY

Bluegrass technicians wire sawed three vertical carbon electrodes with horizontal cuts approximately four feet in diameter in extremely hot working conditions.

Back to Top
CHICKAMAUGA

Bluegrass has been contracted to re-cut the slot in Chickamauga Dam.  Total square feet of concrete to be cut is approximatley five thousand feet.
Back to Top
CRYSTAL RIVER

Bluegrass technicians are diamond wire sawing seven small pipe supports under a large diameter pipe in the circulation water station with limited access from only one end.  The technicians will set up at that end and string over 150 feet of wire to reach the furthest support.
Back to Top
ABC NUCOR STEEL
View
View
View
Click to view larger image

Diamond wire sawed in support of steel mill refurbishing.
Back to Top
BALFOUR BEATTY
View
View
View
Click to view larger image

Cut bridge caisson's 60' underwater.
Back to Top
BRIDGE OF LIONS
View
View
View
Click to view larger image

Provided personnel and equipment to diamond wire saw fourteen piers and two bascules.
Back to Top
BUCKMAN'S BRIDGE
Click to view larger image

Diamond wire sawed footer sections for bridge expansion retrofits.
Back to Top
CLEARWATER BRIDGE
View
View
View
Click to view larger image

Performed segmentation of bridge columns for removal.
Back to Top
CY TEST CUTTING
View
View
View
Click to view larger image

Bluegrass diamond wire cut the carbon steel reactor nozzle mock-up. The nozzle was 55” in diameter with a 28” annulus.
Back to Top
FIU
Click to view larger image

Bluegrass performed a technology demonstration of the Marcrist MSW300 Wall Concrete Shaver, mounted to a remotely operated Brokk 250, as part of the FIU-HCET technology assessment program. Six hundred feet of uncoated concrete walls, coated concrete ceilings and coated brick walls were removed at 1/4" depths.
Back to Top
GRAND GULF NUCLEAR
Click to view larger image

Diamond wire sawing of a section of the AUX Building Rail Road Bay Concrete Wall; 17'x3'7"x1'4" thick; Diamond wire sawed 12" off the top of existing man-way.
Back to Top
HOLT DAM
View
View
View
Click to view larger image

Turnkey removal of discharge ring for turbine and generator upgrade. Provided diamond wire sawing, robotic hammering, and core drilling for concrete removal.
Back to Top
KENTUCKY DAM POWER HOUSE
View
View
View
Click to view larger image

Diamond wire sawed slot for floating mooring bit.
Back to Top
LUCITE
View
View
View
Click to view larger image

Cut and removed 2 end risers from a steel boiler plate which were 11' diameter and 5" thick with a refractory lining 10 inches thick.
Back to Top
SALUDA DAM
View
View
View
Click to view larger image

Dimaond wire sawed 40" hexagons on the riser piers, core drilled over 600 holes for utilization of expansive grout, and Brokked the 1,000 yards of concrete to a rubble.
Back to Top
SOUTHDOWN
View
View
View
Click to view larger image

Diamond wire sawed 3 motor support pedestals flush, 1 compressor foundation flush, and 3' x3' vertical cut to isolate the conduit block from the I-D foundation.
Back to Top
TALLULAH FALLS DAM
View
View
View
Click to view larger image

Removed a concrete section from a plug cut for a pipe insert.
Back to Top