ABC NUCOR STEEL
Diamond wire sawed in support of steel mill refurbishing.
ARKANSAS NUCLEAR STATION
Two 120-ton condensers were split in half so that four 60-ton sections could be removed. The diamond wire cut through 27,000 inconel tubes, steel pipes, and steel baffle plates.
BALFOUR BEATTY
Cut bridge caisson's 60' underwater.
BASELINE
Performed diamond wire sawing and Brokking for fish flume system.
BENICIA REFINERY
Diamond wire sawed compressor foundations for sectioning.
BIG ROCK POINT
Diamond wire sawed over 1,500 tons of highly activated and contaminated concrete surrounding the reactor vessel cavity to support the decommissioning.
BRIDGE OF LIONS
Provided personnel and equipment to diamond wire saw fourteen piers and two bascules.
BRILLIANT DAM
Bluegrass technicians wire sawed a notch from nine piers which required eight feet deep wire access holes. The removed blocks were thirteen tons each and required one vertical and one horizontal cut per pier.
"Bluegrass' expertise in diamond wire sawing services was a great benefit to Dix Corporation while preparing for the installation of a spillway isolation gate at Brilliant Dam."
BUCKMAN'S BRIDGE
Diamond wire sawed footer sections for bridge expansion retrofits.
CLEARWATER BRIDGE
Performed segmentation of bridge columns for removal.
CLINTON MEMORIAL BRIDGE
Wiresawed 14 piers and drilled nearly 300 core holes for anchor bolts, removing 121 cubic yards of concrete.
CY TEST CUTTING
Bluegrass diamond wire cut the carbon steel reactor nozzle mock-up. The nozzle was 55” in diameter with a 28” annulus.
DC COOK NUCLEAR
Bluegrass provided around-the-clock diamond wire cutting in support of SGRP. The entire 3’ thick roof sections, over four steam generators and enclosure walls, were diamond wire cut into 18, 15-ton sections and removed.
DH BLATTNER
Performed diamond wire sawing to segment (2) 6' diameter piers in less than an hour on a railroad bridge.
DIGESTER TANK
Used Brokk robotic hammer to demolish 2, 68' diameter digester lids.
DONOHUE INDUSTRIES
Diamond wire sawed track beams including sole plates during plant shut down.
FIU
Bluegrass performed a technology demonstration of the Marcrist MSW300 Wall Concrete Shaver, mounted to a remotely operated Brokk 250, as part of the FIU-HCET technology assessment program. Six hundred feet of uncoated concrete walls, coated concrete ceilings and coated brick walls were removed at 1/4" depths.
GRAND GULF NUCLEAR
Diamond wire sawing of a section of the AUX Building Rail Road Bay Concrete Wall; 17'x3'7"x1'4" thick; Diamond wire sawed 12" off the top of existing man-way.
HATFIELD
Diamond wire sawed crest off of dam for installation of new flood gates.
HOLT DAM
Turnkey removal of discharge ring for turbine and generator upgrade. Provided diamond wire sawing, robotic hammering, and core drilling for concrete removal.
HUMBOLDT PLANT
Bluegrass diamond wire cut a 250’ tall concrete ventilation stack located directly adjacent to the spent fuel storage area. Bluegrass cut the stack into ring sections of specified length, while working from a moveable, elevated platform. All cooling water was contained and recycled during the cutting process due to contamination potential.
I-45, PIERCE ELEVATED BRIDGE
Pierce Elevated Bridge- Diamond wire sawed 100s of columns in downtown Houston for new bridge utilizing 3-4 saws dialy.
JONESVILLE LOCK & DAM
Diamond wire sawed three pairs of concrete slots into the lock walls so that stoplogs could be installed in the slots.
KENTUCKY DAM POWER HOUSE
Diamond wire sawed slot for floating mooring bit.
KISSNER PRICE-STUBB DAM
Bluegrass technicians diamond wire sawed an ogee dam cut twelve feet by nine feet by three feet as well as core drilled three holes nine feet deep.
LACROSSE BOILING WATER REACTOR
Performed concrete and metal wire cutting for decommissioning.
LOU CON INCORPORATED
Segmentation of lid by diamond wire saw for modifications to existing tank.
LOUISIANA AUDUBON
Cored drilled bridge caisson fifty feet deep at four inches in diameter for the Audubon Bridge Project.
For complete bridge project details visit: http://www.timedla.com/bridge/audubon/
LSU STADIUM
dismantle upper structure of stadium for removations
LUCITE
Cut and removed 2 end risers from a steel boiler plate which were 11' diameter and 5" thick with a refractory lining 10 inches thick.
NUCOR ROLLING MILL UPGRADE
Used 8 robotic hammers to break 600 cubid yards of concrete foundations in 4 days for roll mill upgrade.
OCCI LOCK 19
Performed core drilling, wire sawing and robotic hammering at hydro electric facility.
OCCI, INC
Bluegrass technicians used four robotic hammers around the clock to demolish six feet by twenty-six feet diameter area that consisted of concrete, granite blocks, and brick from the railroad bridge turnstile pier for installation of new support system.
Read more about the project at ENR.com:
http://enr.construction.com/news/transportation/archives/071107b.asp
PEORIA POCKET CREATION
Diamond wire sawed pockets for miter gate gears which required cutting four each 25’ by 10’ on a 10 degree angle at 5’ deep.
RIVERSIDE
Cut down a 30' diameter water intake tower with the last phase of the diamond wire sawing being done 100' underwater.
ROCKY REACH DAM
Diamond wire sawed and Brokking for fish bypass system.
SALUDA DAM
Dimaond wire sawed 40" hexagons on the riser piers, core drilled over 600 holes for utilization of expansive grout, and Brokked the 1,000 yards of concrete to a rubble.
SMUD
Diamond wire sawed in support of the Reactor Vessel Head Segmentation project as well as segmenting reactor head for transport.
SMUD Shaver
Bluegrass performed a technology demonstration of the Marcrist Diamond Floor Shaver and MWS300 Wall Shaver, at the Rancho Seco Nuclear Power Plant turbine building, as requested by the DOE and EPRI, and in conjunction with the National Energy Technology Laboratory (NETL) and several nuclear utility companies. The floor and remote controlled surface decontamination shaving systems shaved concrete at 1/8” to 1/4“ depths, producing a completely smooth, finished surface.
SOUTHDOWN
Diamond wire sawed 3 motor support pedestals flush, 1 compressor foundation flush, and 3' x3' vertical cut to isolate the conduit block from the I-D foundation.
SPHERE ENCLOSURE BUILDING
Performend diamond wire sawing in support of decommissioning of Unit 1 for the demolition of the Sphere Enclosure Building.
TALLULAH FALLS DAM
Removed a concrete section from a plug cut for a pipe insert.
TEXAS MEMORIAL STADIUM
Stadium renovations.
THEATRE UPGRADE
Bluegrass technician