Project Portfolio
 
 
 
All Projects
ABC NUCOR STEEL
View
View
View
Click to view larger image

Diamond wire sawed in support of steel mill refurbishing.
Back to Top
ARKANSAS NUCLEAR STATION
View
View
Click to view larger image

Two 120-ton condensers were split in half so that four 60-ton sections could be removed. The diamond wire cut through 27,000 inconel tubes, steel pipes, and steel baffle plates.
Back to Top
BALFOUR BEATTY
View
View
View
Click to view larger image

Cut bridge caisson's 60' underwater.
Back to Top
BASELINE
View
View
View
Click to view larger image

Performed diamond wire sawing and Brokking for fish flume system.
Back to Top
BENICIA REFINERY
View
View
View
Click to view larger image

Diamond wire sawed compressor foundations for sectioning.
Back to Top
BIG ROCK POINT
View
View
View
Click to view larger image

Diamond wire sawed over 1,500 tons of highly activated and contaminated concrete surrounding the reactor vessel cavity to support the decommissioning.
Back to Top
BRIDGE OF LIONS
View
View
View
Click to view larger image

Provided personnel and equipment to diamond wire saw fourteen piers and two bascules.
Back to Top
BRILLIANT DAM
View
View
View
Click to view larger image

Bluegrass technicians wire sawed a notch from nine piers which required eight feet deep wire access holes.  The removed blocks were thirteen tons each and required one vertical and one horizontal cut per pier.
"Bluegrass' expertise in diamond wire sawing services was a great benefit to Dix Corporation while preparing for the installation of a spillway isolation gate at Brilliant Dam."
Back to Top
BUCKMAN'S BRIDGE
Click to view larger image

Diamond wire sawed footer sections for bridge expansion retrofits.
Back to Top
CLEARWATER BRIDGE
View
View
View
Click to view larger image

Performed segmentation of bridge columns for removal.
Back to Top
CLINTON MEMORIAL BRIDGE
View
View
View
Click to view larger image

Wiresawed 14 piers and drilled nearly 300 core holes for anchor bolts, removing 121 cubic yards of concrete.
Back to Top
CY TEST CUTTING
View
View
View
Click to view larger image

Bluegrass diamond wire cut the carbon steel reactor nozzle mock-up. The nozzle was 55” in diameter with a 28” annulus.
Back to Top
DC COOK NUCLEAR
View
View
Click to view larger image

Bluegrass provided around-the-clock diamond wire cutting in support of SGRP. The entire 3’ thick roof sections, over four steam generators and enclosure walls, were diamond wire cut into 18, 15-ton sections and removed.
Back to Top
DH BLATTNER
View
View
View
Click to view larger image

Performed diamond wire sawing to segment (2) 6' diameter piers in less than an hour on a railroad bridge.
Back to Top
DIGESTER TANK
View
View
View
Click to view larger image

Used Brokk robotic hammer to demolish 2, 68' diameter digester lids.
Back to Top
DONOHUE INDUSTRIES
View
View
View
Click to view larger image

Diamond wire sawed track beams including sole plates during plant shut down.
Back to Top
FIU
Click to view larger image

Bluegrass performed a technology demonstration of the Marcrist MSW300 Wall Concrete Shaver, mounted to a remotely operated Brokk 250, as part of the FIU-HCET technology assessment program. Six hundred feet of uncoated concrete walls, coated concrete ceilings and coated brick walls were removed at 1/4" depths.
Back to Top
GRAND GULF NUCLEAR
Click to view larger image

Diamond wire sawing of a section of the AUX Building Rail Road Bay Concrete Wall; 17'x3'7"x1'4" thick; Diamond wire sawed 12" off the top of existing man-way.
Back to Top
HATFIELD
View
View
View
Click to view larger image

Diamond wire sawed crest off of dam for installation of new flood gates.
Back to Top
HOLT DAM
View
View
View
Click to view larger image

Turnkey removal of discharge ring for turbine and generator upgrade. Provided diamond wire sawing, robotic hammering, and core drilling for concrete removal.
Back to Top
HUMBOLDT PLANT
View
View
View
Click to view larger image

Bluegrass diamond wire cut a 250’ tall concrete ventilation stack located directly adjacent to the spent fuel storage area.  Bluegrass cut the stack into ring sections of specified length, while working from a moveable, elevated platform. All cooling water was contained and recycled during the cutting process due to contamination potential.
Back to Top
I-45, PIERCE ELEVATED BRIDGE
View
View
View
Click to view larger image

Pierce Elevated Bridge- Diamond wire sawed 100s of columns in downtown Houston for new bridge utilizing 3-4 saws dialy.
Back to Top
JONESVILLE LOCK & DAM
View
View
View
Click to view larger image

Diamond wire sawed three pairs of concrete slots into the lock walls so that stoplogs could be installed in the slots.
Back to Top
KENTUCKY DAM POWER HOUSE
View
View
View
Click to view larger image

Diamond wire sawed slot for floating mooring bit.
Back to Top
KISSNER PRICE-STUBB DAM
Click to view larger image

Bluegrass technicians diamond wire sawed an ogee dam cut twelve feet by nine feet by three feet as well as core drilled three holes nine feet deep.
Back to Top
LACROSSE BOILING WATER REACTOR
View
View
View
Click to view larger image

Performed concrete and metal wire cutting for decommissioning.
Back to Top
LOU CON INCORPORATED
View
View
Click to view larger image

Segmentation of lid by diamond wire saw for modifications to existing tank.
Back to Top
LOUISIANA AUDUBON
View
View
View
Click to view larger image

Cored drilled bridge caisson fifty feet deep at four inches in diameter for the Audubon Bridge Project.

For complete bridge project details visit:  http://www.timedla.com/bridge/audubon/
Back to Top
LSU STADIUM
View
View
View
Click to view larger image

dismantle upper structure of stadium for removations
Back to Top
LUCITE
View
View
View
Click to view larger image

Cut and removed 2 end risers from a steel boiler plate which were 11' diameter and 5" thick with a refractory lining 10 inches thick.
Back to Top
NUCOR ROLLING MILL UPGRADE
View
View
View
Click to view larger image

Used 8 robotic hammers to break 600 cubid yards of concrete foundations in 4 days for roll mill upgrade.
Back to Top
OCCI LOCK 19
View
View
View
Click to view larger image

Performed core drilling, wire sawing and robotic hammering at hydro electric facility.
Back to Top
OCCI, INC
View
View
View
Click to view larger image

Bluegrass technicians used four robotic hammers around the clock to demolish six feet by twenty-six feet diameter area that consisted of concrete, granite blocks, and brick from the railroad bridge turnstile pier for installation of new support system.

Read more about the project at ENR.com:
http://enr.construction.com/news/transportation/archives/071107b.asp
Back to Top
PEORIA POCKET CREATION
View
View
View
Click to view larger image

Diamond wire sawed pockets for miter gate gears which required cutting four each 25’ by 10’ on a 10 degree angle at 5’ deep.
Back to Top
RIVERSIDE
View
View
View
Click to view larger image

Cut down a 30' diameter water intake tower with the last phase of the diamond wire sawing being done 100' underwater.
Back to Top
ROCKY REACH DAM
View
View
View
Click to view larger image

Diamond wire sawed and Brokking for fish bypass system.
Back to Top
SALUDA DAM
View
View
View
Click to view larger image

Dimaond wire sawed 40" hexagons on the riser piers, core drilled over 600 holes for utilization of expansive grout, and Brokked the 1,000 yards of concrete to a rubble.
Back to Top
SMUD
View
View
View
Click to view larger image

Diamond wire sawed in support of the Reactor Vessel Head Segmentation project as well as segmenting reactor head for transport.
Back to Top
SMUD Shaver
Click to view larger image

Bluegrass performed a technology demonstration of the Marcrist Diamond Floor Shaver and MWS300 Wall Shaver, at the Rancho Seco Nuclear Power Plant turbine building, as requested by the DOE and EPRI, and in conjunction with the National Energy Technology Laboratory (NETL) and several nuclear utility companies. The floor and remote controlled surface decontamination shaving systems shaved concrete at 1/8” to 1/4“ depths, producing a completely smooth, finished surface.
Back to Top
SOUTHDOWN
View
View
View
Click to view larger image

Diamond wire sawed 3 motor support pedestals flush, 1 compressor foundation flush, and 3' x3' vertical cut to isolate the conduit block from the I-D foundation.
Back to Top
SPHERE ENCLOSURE BUILDING
View
View
View
Click to view larger image

Performend diamond wire sawing in support of decommissioning of Unit 1 for the demolition of the Sphere Enclosure Building.
Back to Top
TALLULAH FALLS DAM
View
View
View
Click to view larger image

Removed a concrete section from a plug cut for a pipe insert.
Back to Top
TEXAS MEMORIAL STADIUM
View
View
View
Click to view larger image

Stadium renovations.
Back to Top
THEATRE UPGRADE
View
View
Click to view larger image

Bluegrass technicians demolished th